SMS:SRH-2D Culvert Workflow: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 18: Line 18:
:#Specify the HY-8 culvert definition file.
:#Specify the HY-8 culvert definition file.
:#Assign the boundary condition attributes and define the [[HY-8:Culvert Crossing Data|culvert in HY-8]].
:#Assign the boundary condition attributes and define the [[HY-8:Culvert Crossing Data|culvert in HY-8]].
:#Modify the [[SMS:SRH Materials Properties|materials]] coverage.
:#Modify the [[SMS:SRH Material Properties|materials]] coverage.
|}
|}
{|class="wikitable collapsible autocollapse"
{|class="wikitable collapsible autocollapse"

Revision as of 17:44, 13 August 2015

To build an SRH-2D model using a culvert, use the following steps:

2. Create culvert boundary conditions.
The culvert boundary conditions must be defined before running the simulation. To do this:
  1. Create a boundary conditions coverage.
  2. Create boundary condition arcs for the culvert.
  3. Specify the HY-8 culvert definition file.
  4. Assign the boundary condition attributes and define the culvert in HY-8.
  5. Modify the materials coverage.
3. Specify the simulation parameters.
The initial conditions of the stream must be defined in the simulation. To do this:
  1. Create new simulation.
  2. Add components to simulation.
  3. Set up the simulation Model Control parameters.
  4. Specify the restart conditions file under initial conditions.
4. Run the SRH-2D simulation.
  1. Save the project.
  2. Check the model.
  3. Simulation execution.
  4. Troubleshooting.
5. Review results.
  1. Load solution datasets.
  2. Run the data calculator.