HY8:Building a Project: Difference between revisions
From XMS Wiki
Jump to navigationJump to search
m (Jcreer moved page HY-8:Building a Project to HY8:Building a Project) |
|||
Line 2: | Line 2: | ||
An HY-8 project involves the design and analysis of single or multiple culverts at one or more crossings. The process of building a culvert project involves the following steps: | An HY-8 project involves the design and analysis of single or multiple culverts at one or more crossings. The process of building a culvert project involves the following steps: | ||
* [[ | * [[HY8:Locate Project|Locate Project]] | ||
* [[HY-8:Culvert Crossing Data|Culvert Crossing Data]] | * [[HY-8:Culvert Crossing Data|Culvert Crossing Data]] | ||
* [[HY-8:Run Analysis|Run Analysis]] | * [[HY-8:Run Analysis|Run Analysis]] |
Revision as of 14:31, 3 October 2016
Building a Project
An HY-8 project involves the design and analysis of single or multiple culverts at one or more crossings. The process of building a culvert project involves the following steps:
Crossings may be added to the project as needed.