HY8:Building a Project: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
 
 
(9 intermediate revisions by 2 users not shown)
Line 2: Line 2:
An HY-8 project involves the design and analysis of single or multiple culverts at one or more crossings.  The process of building a culvert project involves the following steps:
An HY-8 project involves the design and analysis of single or multiple culverts at one or more crossings.  The process of building a culvert project involves the following steps:


* [[WMS:HY-8 Locate Project|Locate Project]]
* [[HY8:Locate Project|Locate Project]]
* [[WMS:HY-8 Culvert Crossing Data|Culvert Crossing Data]]
* [[HY8:Culvert Crossing Data|Culvert Crossing Data]]
* [[WMS:HY-8 Run Analysis|Run Analysis]]
* [[HY8:Run Analysis|Run Analysis]]
* [[WMS:HY-8 Report Generation|Report Generation]]
* [[HY8:Report Generation|Report Generation]]


Crossings may be added to the project as needed.
Crossings may be added to the project as needed.


{{hide in print|
{{HY8Main}}
==''Related Topics''==
[[Category:HY-8 General Information|B]]
 
'''[[WMS:HY-8|HY-8 Main Page]]'''
 
===Introduction===
* [[WMS:HY-8|Introduction]]
* [[WMS:HY-8 Getting Started|HY-8 Getting Started]]
* [[WMS:HY-8 Differences from DOS HY-8|Differences from DOS HY-8]]
* [[WMS:HY-8 Limitations|Limitations]]
====Building a Project====
:* [[WMS:HY-8 Building a Project|Building a Project]]
:* [[WMS:HY-8 Locate Project|Locate Project]]
:* [[WMS:HY-8 Culvert Crossing Data|Culvert Crossing Data]]
:* [[WMS:HY-8 Run Analysis|Run Analysis]]
:* [[WMS:HY-8 Report Generation|Report Generation]]
}}

Latest revision as of 14:47, 3 October 2016

Building a Project

An HY-8 project involves the design and analysis of single or multiple culverts at one or more crossings. The process of building a culvert project involves the following steps:

Crossings may be added to the project as needed.