HY8:Building a Project: Difference between revisions
From XMS Wiki
Jump to navigationJump to search
No edit summary |
|||
(5 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
An HY-8 project involves the design and analysis of single or multiple culverts at one or more crossings. The process of building a culvert project involves the following steps: | An HY-8 project involves the design and analysis of single or multiple culverts at one or more crossings. The process of building a culvert project involves the following steps: | ||
* [[ | * [[HY8:Locate Project|Locate Project]] | ||
* [[ | * [[HY8:Culvert Crossing Data|Culvert Crossing Data]] | ||
* [[ | * [[HY8:Run Analysis|Run Analysis]] | ||
* [[ | * [[HY8:Report Generation|Report Generation]] | ||
Crossings may be added to the project as needed. | Crossings may be added to the project as needed. | ||
{{HY8Main}} | {{HY8Main}} | ||
[[Category:HY-8 General Information|B]] |
Latest revision as of 14:47, 3 October 2016
Building a Project
An HY-8 project involves the design and analysis of single or multiple culverts at one or more crossings. The process of building a culvert project involves the following steps:
Crossings may be added to the project as needed.