|
|
(2 intermediate revisions by the same user not shown) |
Line 1: |
Line 1: |
| If a hydrograph is known for a given basin, there is no need to compute a synthetic hydrograph. This hydrograph can be input by selecting the check box and then defining the hydrograph using the [[WMS:XY Series Editor|XY Series Editor]].
| | #redirect [[WMS:Basin_HEC-1_Cards#Input_Hydrograph_.28QI.29]] |
| | |
| Precipitation, base flow, loss rates, and unit hydrograph methods for each hydrograph must be specified, regardless of whether or not a TIN is being used, before a complete HEC-1 file can be created. Selecting all of the basins enters data for one or more basins.
| |
| | |
| :NOTE: If no basins are selected, the information entered is applied to all basins.
| |
| | |
| | |
| ==Related Topics==
| |
| * [[WMS:HEC-1 Parameters|Editing HEC-1 Parameters]]
| |
| * [[WMS:Basin HEC-1 Cards#Basin Name (KK)|Basin Data]]
| |
| * [[WMS:HEC-1 Job Control#HEC-1 Observed Hydrograph (QO)|Observed Hydrograph]]
| |
| | |
| | |
| {{WMSMain}}
| |
| | |
| [[Category:HEC-1|I]]
| |
| {{stub}}
| |