Template:GMS MODFLOW 6 ZONEBUDGET Workflow: Difference between revisions
From XMS Wiki
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
{| class="mw-collapsible mw-collapsed" style="width:100%; border:1px solid #CDB7B5; margin-bottom:0.4em;" | {| class="mw-collapsible mw-collapsed" style="width:100%; border:1px solid #CDB7B5; margin-bottom:0.4em;" | ||
|- | |- | ||
!style="text-align:left;"|1. Create the | !style="text-align:left;"|1. Create the Zones package. | ||
|- | |- | ||
| | | |
Revision as of 17:48, 26 July 2022
1. Create the Zones package.
- Use the New Package | Zones command to open the Zone File dialog.
- Using the Zone File dialog, define the zones.
- Right-click on the MODFLOW 6 simulation and select Save Simulation to export the zone package file.
2. Run ZONEBUDGET.
- Under the MODFLOW solution folder in the Project Explorer, right-click on the file ending in ".cbc" and select Run ZONEBUDGET.
3. Visualize the results of ZONEBUDGET.
- Under the folder ending in "zone_budget", double-click on either file to open it in an outside program.
- The file ending in ".lst" has the results of ZONEBUDGET at the bottom under a section that begins VOLUME BUDGET.
- The file ending in ".csv" can be opened in a spreadsheet application or a text editor.