HY8:Discharge Data: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
 
No edit summary
Line 20: Line 20:




{{hide in print|
{{HY8Main}}
==''Related Topics''==
 
===Introduction===
* [[WMS:HY-8|Introduction]]
===Crossings Data===
* [[WMS:HY-8 Crossings|Crossings]]
* [[WMS:HY-8 Discharge Data|Discharge Data]]
====Roadway Data====
:* [[WMS:HY-8 Roadway Data|Roadway Data]]
:* [[WMS:HY-8 Roadway Profile|Roadway Profile]]
====Tailwater Data====
:* [[WMS:HY-8 Tailwater Data|Tailwater Data]]
:* [[WMS:HY-8 Channel Shape|Channel Shape]]
:* [[WMS:HY-8 Rating Curve|Rating Curve]]
:* [[WMS:HY-8 Constant Tailwater Elevation|Constant Tailwater Elevation]]
=====Irregular Channel=====
::* [[WMS:HY-8 Irregular Channel|Irregular Channel]]
::* [[WMS:HY-8 Irregular Channel Error|Irregular Channel Error]]
}}

Revision as of 16:14, 1 July 2011

Discharge Data

HY-8 will perform culvert hydraulic calculations based on the input minimum, design, and maximum discharge values. Calculations comprising the performance curve are made for ten equal discharge intervals between the minimum and maximum values. A user may input a narrower range of discharges in order to examine culvert performance for a discharge interval of special interest.


MINIMUM DISCHARGE

Lower limit used for the culvert performance curve. Can be edited to a number greater than '0'.


DESIGN DISCHARGE

Discharge for which the culvert will be designed. Always included as one of the points on the performance curve.


MAXIMUM DISCHARGE

Upper limit used for the culvert performance curve.