WMS:Defining Basins (TINs): Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
 
(Redirected page to WMS:TIN Basins)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
The '''Define Basins''' command assigns each triangle in the TIN to a drainage basin. This is accomplished by initiating a flow path from the centroid of each triangle and "flowing" down until an outlet point is encountered. The triangle is then assigned the appropriate basin ID. The boundaries may appear rough or jagged because each triangle is assigned according to the flow from its centroid, when in fact the triangle may actually straddle basin boundaries. Boundaries may be corrected by issuing the '''[[WMS:Refining Boundaries|Refine Boundaries]]''' command. The drainage basin boundaries option in the Drainage [[WMS:Display Options|Display Options]] dialog is automatically set when defining basins.
#REDIRECT [[WMS:TIN Basins]]
 
==Related Topics:==
* [[WMS:Outlets|Outlets]]
* [[WMS:Streams|Streams]]
* [[WMS:HEC-1 Reservoirs|Reservoirs]]
* [[WMS:Refining Boundaries|Refining Boundaries]]
* [[WMS:TIN Guidelines|Delineation with TINs]]
* [[WMS:Delineation with DEMs|Delineation with DEMs]]
* [[WMS:Computing Basin Data (TINs)|Computing Basin Data]]
 
 
{{Template:WMSMain}}
[[Category:TINs]]

Latest revision as of 19:32, 31 July 2013

Redirect to: