|
|
Line 1: |
Line 1: |
| The inflow for the diversion can be determined in one of two ways: either by using a [[WMS:TR-20 Defined Cross Sections|cross-section]] for the main channel or by using a structure for the main channel. Cross-sections are defined using the same dialog as for reaches as described in the section on channel routing. Structures are defined in the same way as structures for [[WMS:TR-20 Reservoir Data|reservoir routing]].
| | #REDIRECT [[WMS:TR-20 Diversion Data]] |
| | |
| | |
| ==Related Topics==
| |
| * [[WMS:TR-20|TR20 Overview]]
| |
| * [[WMS:TR-20 Edit Parameters|Editing TR20 Parameters]]
| |
| * [[WMS:TR-20 Outflow Parameters|Outflow Parameters]]
| |
| | |
| | |
| {{WMSMain}}
| |