WMS:HEC-1 Input Hydrograph (QI): Difference between revisions

From XMS Wiki
Jump to navigationJump to search
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
If a hydrograph is known for a given basin, there is no need to compute a synthetic hydrograph. This hydrograph can be input by selecting the check box and then defining the hydrograph using the [[WMS:XY Series Editor|XY Series Editor]].
#redirect [[WMS:Basin_HEC-1_Cards#Input_Hydrograph_.28QI.29]]
 
Precipitation, base flow, loss rates, and unit hydrograph methods for each hydrograph must be specified, regardless of whether or not a TIN is being used, before a complete HEC-1 file can be created. Selecting all of the basins enters data for one or more basins.  
 
NOTE: If no basins are selected, the information entered is applied to all basins.
 
 
==Related Topics==
* [[WMS:HEC-1 Parameters|Editing HEC-1 Parameters]]
* [[WMS:Basin HEC-1 Cards#Basin Name (KK)|Basin Data]]
* [[WMS:HEC-1 Observed Hydrograph (QO)|Observed Hydrograph]]
 
 
{{WMSMain}}

Latest revision as of 16:11, 13 December 2017