GSSHA is a two-dimensional finite difference rainfall/runoff model. A finite difference grid is used to establish the computational domain and parameters for surface runoff. The GSSHA model is fully coupled with hydraulic stream flow/routing models. Parameters for stream channels are defined using arcs and then mapped to the appropriate underlying grid cells.
{{TOC right}}
Parameters for stream channels in [[WMS:GSSHA|GSSHA]] are defined using arcs and then mapped to the appropriate underlying grid cells. In order to define GSSHA channel parameters using arcs, the current coverage type must be set to "GSSHA". GSSHA is a two-dimensional finite difference rainfall/runoff model. A finite difference grid is used to establish the computational domain and parameters for surface runoff. The GSSHA model is fully coupled with hydraulic stream flow/routing models.  


In order to define GSSHA channel parameters using arcs, the current coverage type must be set to GSSHA.
==Smoothing Stream Cells==
Because elevation data used to define the surface runoff component of GSSHA does not contain the detailed resolution required to capture the actual stream bed elevation of the channels, the bed elevation profile can be highly irregular. These abrupt changes in elevation can cause instabilities in the channel routing computations, and therefore must be smoothed out.


==Smoothing Stream Cells==
The '''Smooth Stream Arcs''' command is used to adjust the elevation of the stream bed for GSSHA:
Because elevation data used to define the surface runoff component of GSSHA does not contain the detailed resolution required to capture the actual stream bed elevation of the channels, the bed elevation profile can be highly irregular. These irregularities, or abrupt changes in elevation can cause instabilities in the channel routing computations, and therefore must be smoothed out.
#Select a continuous set of arcs which represent the stream
#Select ''GSSHA'' | '''Smooth Stream Arcs'''
 
Initially, the bed elevation is assigned the same value as the grid. Whenever a profile is shown, the bed elevation profile is displayed in blue while the grid elevation of the cell is shown in red. Make sure that no bed elevation is higher than the grid cell elevation.


The '''Smooth Stream Arcs''' command is used to adjust the elevation of the stream bed for GSSHA. Smoothing is done by first selecting a continuous set of arcs which represent the stream and then choosing the '''Smooth Stream Arcs''' command from the ''GSSHA'' menu.
== Renumber Links and Nodes ==


Initially the bed elevation is assigned the same value as the grid. Whenever a profile is shown, the bed elevation profile is displayed in blue while the grid elevation of the cell is shown in red. Care should be taken to see that no bed elevation is higher than the grid cell elevation.
In order to properly execute the channel routing routines of GSSHA, the stream channel must have the proper order and connectivity. This ordering or numbering can be done automatically by selecting ''GSSHA'' | '''Renumber Links and Nodes'''.


== Renumber Links And Nodes ==
Links define whole channel segments and must therefore be numbered in ascending order from upstream to downstream. In other words, all channel segments must flow into downstream segments with a higher link number.


In order to properly execute the channel routing routines of GSSHA, the stream channel must have the proper order and connectivity. This ordering or numbering can be done automatically using the '''Renumber Links and Nodes''' command from the ''GSSHA'' menu.
==GSSHA Channel Routing Parameters Dialog==
[[File:WMS GSSHA Channel Routing Parameters Dialog.png|thumb|right|280px|The ''GSSHA Channel Routing Parameters'' dialog.]]
The ''GSSHA Channel Routing Parameters'' dialog is accessed by selecting ''Diffusive wave'' in the ''Channel routing computation scheme'' section of the [[WMS:GSSHA Job Control#Channel Routing Computation Scheme|''GSSHA Job Control Parameters'' dialog]], then clicking '''Edit Parameters...'''. It has the following options:
*Top section
**''Minimum flow'' – A decimal value in cms.
**''Allow overbank flow'' – Allow water in channel to flow back onto overland flow plane when stream elevation is above top of bank and the adjacent overland cell elevation.
**''Allow overland backwater'' – Include backwater effects on overland when stream water surface elevation or TOB is greater than overland flow surface elevation without allowing water in channel to flow back onto overland.
**''Outlet head BC'' – A decimal value in meters.
**''Create hot start file'' – Turn on to create a hot start file.
**''Start from hot start file'' – Turn on to specify a hot start file.
*''Channel erosion'' section
**''Sediment porosity'' – Value of the porosity of the channel bed sediments (0.0–1.0).
**''Water temperature'' – The water temperature in a decimal number (degrees Celsius).
**''Sand size'' – The diameter of the sediment particle. A decimal value in millimeters.
*''Contaminant transport'' section
**''Compute contaminant transport'' – Activates inputs for contaminant transport in the model.
**''Decay coefficient'' – A decimal value per day of the first order decay coefficient of constituents in the channel.
**''Dispersion coefficient'' &ndash; A decimal value in m<sup>2</sup> per second.
**''Initial concentration'' &ndash; The beginning concentration of a contaminant. A decimal value in milligrams per liter.


Links define whole channel segments and must be numbered such that any segment has no "upstream" segments with a link number that is greater than itself. In other words all channel segments must "flow" into downstream segments with a higher link number.
At the bottom are three buttons:
*'''Help''' &ndash; Opens this section on this page in a web browser.
*'''OK''' &ndash; Saves all changes made and exits the ''GSSHA Channel Routing Parameters'' dialog.
*'''Cancel''' &ndash; Discards all changes made and exits the ''GSSHA Channel Routing Parameters'' dialog.


== Related Topics ==
== Related Topics ==
* [[WMS:GSSHA|GSSHA Overview]]
* [[WMS:2D Grid Module|Grids]]
* [[WMS:2D Grid Module|Grids]]


{{GSSHAMain
|PLinks=
* [http://gsshawiki.com/index.php?title=Overview:Overview Overview]
|GUMLinks=
* [http://gsshawiki.com/index.php?title=Introduction:Preface Preface]
* [http://gsshawiki.com/index.php?title=Introduction:Introduction Introduction]


}}
{{GSSHA Wiki}}
{{WMSMain}}


[[Category:GSSHA|C]]
[[Category:GSSHA|C]]

Latest revision as of 17:45, 24 July 2024


Parameters for stream channels in GSSHA are defined using arcs and then mapped to the appropriate underlying grid cells. In order to define GSSHA channel parameters using arcs, the current coverage type must be set to "GSSHA". GSSHA is a two-dimensional finite difference rainfall/runoff model. A finite difference grid is used to establish the computational domain and parameters for surface runoff. The GSSHA model is fully coupled with hydraulic stream flow/routing models.

Smoothing Stream Cells

Because elevation data used to define the surface runoff component of GSSHA does not contain the detailed resolution required to capture the actual stream bed elevation of the channels, the bed elevation profile can be highly irregular. These abrupt changes in elevation can cause instabilities in the channel routing computations, and therefore must be smoothed out.

The Smooth Stream Arcs command is used to adjust the elevation of the stream bed for GSSHA:

  1. Select a continuous set of arcs which represent the stream
  2. Select GSSHA | Smooth Stream Arcs

Initially, the bed elevation is assigned the same value as the grid. Whenever a profile is shown, the bed elevation profile is displayed in blue while the grid elevation of the cell is shown in red. Make sure that no bed elevation is higher than the grid cell elevation.

Renumber Links and Nodes

In order to properly execute the channel routing routines of GSSHA, the stream channel must have the proper order and connectivity. This ordering or numbering can be done automatically by selecting GSSHA | Renumber Links and Nodes.

Links define whole channel segments and must therefore be numbered in ascending order from upstream to downstream. In other words, all channel segments must flow into downstream segments with a higher link number.

GSSHA Channel Routing Parameters Dialog

The GSSHA Channel Routing Parameters dialog.

The GSSHA Channel Routing Parameters dialog is accessed by selecting Diffusive wave in the Channel routing computation scheme section of the GSSHA Job Control Parameters dialog, then clicking Edit Parameters.... It has the following options:

  • Top section
    • Minimum flow – A decimal value in cms.
    • Allow overbank flow – Allow water in channel to flow back onto overland flow plane when stream elevation is above top of bank and the adjacent overland cell elevation.
    • Allow overland backwater – Include backwater effects on overland when stream water surface elevation or TOB is greater than overland flow surface elevation without allowing water in channel to flow back onto overland.
    • Outlet head BC – A decimal value in meters.
    • Create hot start file – Turn on to create a hot start file.
    • Start from hot start file – Turn on to specify a hot start file.
  • Channel erosion section
    • Sediment porosity – Value of the porosity of the channel bed sediments (0.0–1.0).
    • Water temperature – The water temperature in a decimal number (degrees Celsius).
    • Sand size – The diameter of the sediment particle. A decimal value in millimeters.
  • Contaminant transport section
    • Compute contaminant transport – Activates inputs for contaminant transport in the model.
    • Decay coefficient – A decimal value per day of the first order decay coefficient of constituents in the channel.
    • Dispersion coefficient – A decimal value in m2 per second.
    • Initial concentration – The beginning concentration of a contaminant. A decimal value in milligrams per liter.

At the bottom are three buttons:

  • Help – Opens this section on this page in a web browser.
  • OK – Saves all changes made and exits the GSSHA Channel Routing Parameters dialog.
  • Cancel – Discards all changes made and exits the GSSHA Channel Routing Parameters dialog.

Related Topics