Template:Map Activity to UGrid: Difference between revisions
From XMS Wiki
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 11: | Line 11: | ||
Unstructured Grids/Map Activity to UGrid | Unstructured Grids/Map Activity to UGrid | ||
{{-}} | {{-}} | ||
<noinclude>[[Category:Toolbox]]</noinclude> | <noinclude>[[Category:Toolbox UGrid]]</noinclude> |
Revision as of 15:39, 24 October 2023
Map Activity to UGrid
This tool builds a dataset with values copied from one dataset and activity mapped from another. The tool has the following options:
Input Parameters
- Input grid– Select the geometry that will define the values for the new UGrid.
- Activity coverage – Select the coverage that will define the activity for the new UGrid.
Output Paramters
- Name of the output ugrid – Enter the name for the new activity UGrid.
Current Location in Toolbox
Unstructured Grids/Map Activity to UGrid