Template:SMS GSSHA Simulation Workflow: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 1: Line 1:
__NOINDEX__
{| class="mw-collapsible mw-collapsed" style="width:100%; border:1px solid #D0E0FF; margin-bottom:0.4em;"
{| class="mw-collapsible mw-collapsed" style="width:100%; border:1px solid #D0E0FF; margin-bottom:0.4em;"
|-
|-
Line 48: Line 49:
{{GSSHA Run Simulation Workflow}}
{{GSSHA Run Simulation Workflow}}
|}
|}
<noinclude>[[Category:SMS Workflow Templates]]</noinclude>

Revision as of 18:26, 17 June 2024

1. Create a new GSSHA simulation.
After creating the components of a simulation, create a new GSSHA simulation.
  1. Right-click in the Project Explorer and select the New Simulations | GSSHA command.
2. Add GSSHA simulation components.
To link components to the simulation, do one of the following.
  1. Right-click on the component and select the simulation name from the Apply To submenu.
  2. In the Project Explorer, click and drag items under the simulation object.
3. Set GSSHA model parameters.
  1. Right-click on the simulation and select the Model Control command.
  2. Set the model parameters in the GSSHA Model Control dialog.
4. Mapping tables
  1. Mapping Tables Set parameters for Hydrologic computations
5. Define Precipitation
  1. GSSHA Model Control define precipitation
6. Set Elevation
  1. Set Elevation dataset
7. Run the GSSHA simulation.

Template:GSSHA Run Simulation Workflow