User:Jcreer/TR-55 Parameters: Difference between revisions
From XMS Wiki
Jump to navigationJump to search
(→Basins) |
(→Basins) |
||
Line 8: | Line 8: | ||
*''Compute Tc – Map Data'' – Opens the [[WMS:Combining Arc Travel Times|''Travel Time Computation'']] dialog. | *''Compute Tc – Map Data'' – Opens the [[WMS:Combining Arc Travel Times|''Travel Time Computation'']] dialog. | ||
*''Drainage Area (Am)(mi^2)'' – Indicates the size of the sub-area drainage area. | *''Drainage Area (Am)(mi^2)'' – Indicates the size of the sub-area drainage area. | ||
*''Rainfall (P)(in)'' | *''Rainfall (P)(in)'' – Estimated 24-hour rainfall value. | ||
*''Runoff Curve Number (CN)'' – Value used to predict direct runoff or infiltration from rainfall excess. | *''Runoff Curve Number (CN)'' – Value used to predict direct runoff or infiltration from rainfall excess. | ||
*Pond and Swamp Area (%) | *Pond and Swamp Area (%) |
Revision as of 15:25, 14 September 2016
The TR-55 parameters dialog is accessed by right-clicking on a basin or outlet then selecting the Edit Paremeters command. The dialog allows setting model parameters for either "Basins" or "Outlets" depending which option is selected at the top of the dialog. Parameters can be set for the "Selected" basin or outlet, or for "All" basins or outlets based on the selected option at the top of the dialog.
Options available include:
Basins
- Basin Name – Enter the desired name for the basin.
- Time of Concentration (TC)(hr) – Displays the current time of concentration value which can be manually edited.
- Compute Tc – Basin Data – Opens the Basin Time Computation dialog.
- Compute Tc – Map Data – Opens the Travel Time Computation dialog.
- Drainage Area (Am)(mi^2) – Indicates the size of the sub-area drainage area.
- Rainfall (P)(in) – Estimated 24-hour rainfall value.
- Runoff Curve Number (CN) – Value used to predict direct runoff or infiltration from rainfall excess.
- Pond and Swamp Area (%)
- Rainfall Distribution
- Unit Peak Discharge Computation Method
- Potential Maximum Retention (S)(in)
- Runoff (Q)(in)
- Initial Abstraction (Ia)(in)
- Initial Abstraction / Rainfall (Ia/P)
- Unit Peak Discharge (Qu)(cfs/mi^2/in)
- Pond and Swamp Factor (Fp)
- Peak Discharge (Qp=Qu*Am*Q*Fp)(csf)
- Compute Hydrograph
Outlets
- Outlet Name – Enter the desired name for the outlet.
- Travel Time (hr)
- Compute Travel Time
- Compute Hydrograph