Template:Bridge Scour Properties Workflow: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 31: Line 31:
|
|
:In the ''Bridge Scour Coverage Properties'' dialog:
:In the ''Bridge Scour Coverage Properties'' dialog:
:# Select the ''Contraction Scour Variable Extraction Approach'' as either "Streamlines" or "Bank with Ratios".
:# Select the ''Contraction Scour Variable Extraction Approach'' as either "Streamlines" or "Bank Width Ratios".
:# Select the ''NCHRP Abutment Scour Condition'' as either "Type a" or "Type b".
:# Select the ''NCHRP Abutment Scour Condition'' as either "Type a" or "Type b".
|}
|}

Revision as of 15:55, 30 November 2017

1. Open the Bridge Scour Coverage Properties dialog.
  1. Right-click on the Bridge Scour coverage in the Project Explorer and select the Custom Properties command.
2. Define the gradation.
  1. In the Bridge Scour Coverage Properties dialog, select the Define Soil Gradation button.
  2. Enter gradation in the Bridge Scour Soil Gradation dialog.
3. Select datasets.
  1. In the Bridge Scour Coverage Properties dialog, select the 2D Mesh to use which will define which datasets are available.
  2. In the Bridge Scour Coverage Properties dialog, select the desired mesh and datasets for the following:
    • Water Surface Elevations
    • Water Depth
    • Water Velocity
4. Model Specifications.
In the Bridge Scour Coverage Properties dialog:
  1. Select the Contraction Scour Variable Extraction Approach as either "Streamlines" or "Bank Width Ratios".
  2. Select the NCHRP Abutment Scour Condition as either "Type a" or "Type b".
5. Set advanced options if needed.
  1. In the Bridge Scour Coverage Properties dialog, select the Edit Advanced Options button.
  2. Define advanced options in the Bridge Scour Advanced Options dialog.