HY8:Embankment Toe Data: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 14: Line 14:
[[Image:HY8SitedataEmbankmentToe.jpg]]
[[Image:HY8SitedataEmbankmentToe.jpg]]
   
   
==''Related Topics''==
===Introduction===
* [[WMS:HY-8|Introduction]]
===Culvert Data===
====Culvert Data====
:* [[WMS:HY-8 Culvert Data|Culvert Data]]
:* [[WMS:HY-8 Shapes|Shapes]]
:* [[WMS:HY-8 Material|Material]]
:* [[WMS:HY-8 Plastic Pipe Materials|Plastic Pipe Materials]]
:* [[WMS:HY-8 Concrete Open Bottom Arch|Concrete Open-Bottom Arch]]
:* [[WMS:HY-8 Inlet Type|Inlet Type]]
:* [[WMS:HY-8 Inlet Edge Conditions|Inlet Edge Conditions]]
:* [[WMS:HY-8 Inlet Depression|Inlet Depression]]
:* [[WMS:HY-8 Embedment Depth|Embedment Depth]]
====Site Data====
:* [[WMS:HY-8 Site Data Input Option|Site Data Input Option]]
:* [[WMS:HY-8 Culvert Invert Data|Culvert Invert Data]]
:* [[WMS:HY-8 Embankment Toe Data|Embankment Toe Data]]


{{HY8Main}}
{{HY8Main}}

Revision as of 16:10, 1 July 2011

Embankment toe data are used to describe the fill into which a culvert will be placed. No culvert dimensions are provided at this point, and the goal of the designer is to fit the culvert in the designed roadway cross section when geometry is provided from design drawings. Once the culvert height has been entered, the program will calculate the culvert invert station and elevation data (see the diagram below). The following parameters are defined by the user and are shown in the figure below:


  • Upstream Station -- Station (m or ft) of the upstream intersection of the stream bed or drainage channel and embankment slope
  • Upstream Elevation -- Stream bed elevation (m or ft) at upstream station
  • Upstream Embankment Slope -- Embankment slope on the upstream side of the roadway (m/m or ft/ft)
  • Downstream Station -- Station (m or ft) of downstream intersection of the stream bed or drainage channel and embankment slope. Must be greater than the upstream station.
  • Downstream Elevation -- Stream bed elevation (m or ft) at downstream station
  • Downstream Embankment Slope -- Embankment slope on the downstream side of the roadway (m/m or ft/ft)
  • Number of Barrels -- Program default is 1 barrel, although the user may place multiple barrels with the same characteristics