WMS:GSSHA Save Project File: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
(Redirected page to WMS:GSSHA)
 
Line 1: Line 1:
Specify the GSSHA project file name and location in the ''Save GSSHA Project File'' dialog. Select ''Save'' to save the GSSHA project file and all other GSSHA input files. WMS automatically uses the GSSHA project file name as a prefix for all GSSHA input files (file extensions are used to differentiate between GSSHA input files), except for the index map files, which are assigned default names using the convention id_map_##.idx, where ## is generated by WMS. All files are written to the same directory according to the specified location.
#REDIRECT [[WMS:GSSHA]]
 
For long term simulations WMS copies the HMET file from its original location to the new GSSHA project directory.
 
It is also possible to manage all of the GSSHA input and output files names using the ''Manage files'' option in the ''GSSHA Job Control Parameters'' dialog.
 
==Related Topics==
* [[WMS:GSSHA|GSSHA Overview]]
* [[WMS:GSSHA Run Simulation|Run GSSHA]]
* [[WMS:GSSHA Job Control|GSSHA Job Control]]
* [[WMS:GSSHA Manage Files|Manage Files]]
 
{{GSSHAMain
 
|PLinks=
* [http://gsshawiki.com/index.php?title=Running_GSSHA:Running_GSSHA Running GSSHA]
** [http://gsshawiki.com/index.php?title=Running_GSSHA:Running_GSSHA_from_WMS Running GSSHA from WMS]
** [http://gsshawiki.com/index.php?title=Running_GSSHA:Project_file Project File]
 
|GUMLinks=
* [http://gsshawiki.com/index.php?title=Output:Output Output]
** [http://gsshawiki.com/index.php?title=Output:Run_Summary_File Run Summary File]
 
}}

Latest revision as of 17:21, 3 September 2013

Redirect to: