WMS:HEC-1 MultiFlood Storms (JR): Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
(Redirected page to WMS:HEC-1 Job Control)
 
Line 1: Line 1:
==Multiple Flood Storms==
#REDIRECT [[WMS:HEC-1 Job Control]]
 
Multiple ratios of a given storm event can be specified by bringing up the Multi-flood dialog using the '''Define Multi-Flood Storms''' button. The data input options are described below.
 
[[Image:WMSImage192.jpg|thumb|none|200 px]]
 
==Method==
 
Input ratios can be specified using either precipitation or runoff.
 
==Ratios==
 
Up to nine different storm ratios can be specified by toggling on the appropriate check box. All hydrograph or precipitation ordinates are multiplied by the specified value.
 
Each storm is analyzed during execution of HEC-1 and the resulting TAPE22 file will contain as many hydrographs for each station as there are ratios defined. Display of different storm ratios can be toggled on and off in the ''Hydrologic Modeling'' tab of the ''Display Options'' dialog.
 
 
==Related Topics==
* [[WMS:HEC-1 Job Control|Job Control Data]]
* [[WMS:HEC-1 Parameters|Edit HEC-1 Parameters]]
* [[WMS:HEC-1 Depth Area Storms (JD)|Depth Area Storms (JD)]]
 
 
{{WMSMain}}

Latest revision as of 17:41, 9 September 2013