CW:CityWater Project Details

From XMS Wiki
Revision as of 16:40, 9 January 2018 by Jcreer (talk | contribs) (→‎Map)
Jump to navigationJump to search

The Project Details contains a number of tabs which display data from the project files.

On the left side of the page are two buttons.

  • Edit – This button brings up the Edit Project page which is similar to the Create New Project page having the same options. This allows changing the project name, details, and other information that was entered when the project was created.
  • Delete – This button removes the project.

Summary

Example of the Summary tab in the Project Details page

The Summary tab in the Project Details page displays information about the project.

General

  • Project Name
  • Description
  • Date Created

Model Parameters

  • Flow Units
  • Headloss Formula
  • Quality Parameter
  • Report Time Steps
  • Report Time Step
  • Report Start Time

Nodes

  • Number of Junctions
  • Number of Reservoirs
  • Number of Tanks
  • Total Nodes

Links

  • Number of Pipes
  • Number of Pumps
  • Number of Valves
  • Total Links

Demand

  • Positive Demand
  • Negative Demand

Changes

The Changes tab only appears for scenarios. Select a scenario to access this tab. The tab displays a list of differences between the base model and the scenario. Changes are organized in to changes to the global options, time options, nodes, or links. Changes to nodes and links will contain a hyperlink to jump to the that particular link or node in the project map.

Example of the Changes tab on the Project Details page

Model Options

The Model Options tab allows viewing and changing parameters for a the model run. For the base model, the options can only be viewed. For simulations, the options can be changed by clicking the Edit button.

Example of the Model Options tab on the Project Details page

Map

Example of the Map tab on the Project Details page

The Map tab displays information about the project map.

Spatial Reference System

This section displays the spatial reference system the project is using.

  • Go To Map – This button will open the project Map page.

Annotations

This section will show any notes or annotations added to the map.

  • Nodes – Will show a list of annotations attached to nodes on the project map page.
  • Links – Will show a list of annotations attached to links on the project map page.

A search function is located next to each option to facilitate finding annotations for nodes and links. Enter the node or link name to view annotations for that element.

Map Preview

This section shows a scaled down image of the pipe network in the project Map page.

Curves

Example of the Curves tab on the Project Details page

The Curves tab displays a curve graph for the selected pump. Select the pump curve to display from the drop down menu in upper left portion of the tab. Clicking the Menu Icon.png icon in the upper right portion of the tab will bring up a menu with commands for printing the graph or downloading the graph as an image file.

Patterns

The Patterns tab will display a bar graph of water usage. The type of usage can be selected from the drop down list in the upper left portion of the tab. Clicking the Menu Icon.png icon in the upper right portion of the tab will bring up a menu with commands for printing the graph or downloading the graph as an image file.

Example of the Patterns tab on the Project Details page

Rules/Controls

The Rules/Controls tab allows viewing, creating, and editing rules and controls applied to scenarios. With the base project, the rules and controls are only displayed and cannot be created or edited. After a scenario has been created, new rules or controls can be added by clicking the add TethysAddIcon2.png button. Existing rules or controls for a scenario can be edited by clicking the edit TethysEditIcon2.png button.

Example of the Rules/Controls tab in the Project Details page

Energy

Example of the Energy tab in the Project Details page

The Energy tab in the Project Details page contains a report of energy usage for each pump in the CityWater project.

Energy Report

  • Demand Charge
  • Total Cost

Energy Table

  • Pump Label
  • % Utilization
  • Avg Efficiency
  • kw-hr/mgd
  • Avg kw
  • Peak kw
  • Cost/day

Run Summary

The Run Summary tab displays a file with a more complete analysis of the pipe network.

Example of the Run Summary tab on the Project Details page

Export

The Export tab provides options of exporting the project data as a shapefile.

Report Map Shapefile

  • Variable
  • Time Step
  • Export Report Map

Network Map Shapefile

  • Export Network Map

EPANET Input File

  • Export Input File
Example of the Export tab in the Project Details page


Related Topics