HY8:Culvert Crossing Data

From XMS Wiki
Jump to navigationJump to search

Input Crossing and Culvert data

The user may choose up to 99 barrels for each culvert that is defined by the same site conditions, shape configuration, culvert type, and "n", and/or up to 6 independent culverts. In both cases the culverts share the same headwater pool, tailwater pool or channel, and roadway characteristics. The input properties define the crossing and culvert. The data defining each culvert are entered in the input parameters widow. This window is accessed from the File menu, or from Project Explorer window by right clicking on the culvert or crossing and selecting "Culvert Crossing Data" from the list. The user may also select the culvert properties icon from the tool bar . From the Culvert Crossing Data window, the site, culvert, tailwater, discharge, and roadway data are all entered.


File:HY8image30.jpg


Culvert Crossing Data Window

All of the parameters necessary to define crossing and culvert information can be defined from the Culvert Crossing Data Window as shown below.


File:HY8image48.gif