HY8:USBR Type IV Stilling Basin: Difference between revisions
From XMS Wiki
Jump to navigationJump to search
No edit summary |
|||
Line 7: | Line 7: | ||
Variables from the figure | Variables from the figure | ||
* y<sub>1</sub> | * y<sub>1</sub> — height of the chute blocks | ||
* h<sub>1</sub> | * h<sub>1</sub> — width of the chute blocks | ||
* h<sub>4</sub> | * h<sub>4</sub> — Height of the end sill | ||
* W<sub>1</sub> | * W<sub>1</sub> — space between chute blocks | ||
* W<sub>2</sub> | * W<sub>2</sub> — height of the end sill | ||
* L<sub>B</sub> | * L<sub>B</sub> — Length of the bottom of the basin | ||
{{HY8Main}} | {{HY8Main}} |
Revision as of 21:12, 9 January 2013
The only input variable required for this calculation is the following:
- Basin Width
Variables from the figure
- y1 — height of the chute blocks
- h1 — width of the chute blocks
- h4 — Height of the end sill
- W1 — space between chute blocks
- W2 — height of the end sill
- LB — Length of the bottom of the basin