HY8:USBR Type IV Stilling Basin: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
 
No edit summary
Line 7: Line 7:
Variables from the figure               
Variables from the figure               


* Y1 -- height of the chute blocks
* y<sub>1</sub> -- height of the chute blocks
* h1 -- width of the chute blocks
* h<sub>1</sub> -- width of the chute blocks
* h4 -- Height of the end sill
* h<sub>4</sub> -- Height of the end sill
* W1 -- space between chute blocks
* W<sub>1</sub> -- space between chute blocks
* W2 -- height of the end sill
* W<sub>2</sub> -- height of the end sill
* LB -- Length of the bottom of the basin
* L<sub>B</sub> -- Length of the bottom of the basin
 




{{HY8Main}}
{{HY8Main}}

Revision as of 21:24, 16 December 2011

The only input variable required for this calculation is the following:

  • Basin Width

HY8image27.jpg

Variables from the figure

  • y1 -- height of the chute blocks
  • h1 -- width of the chute blocks
  • h4 -- Height of the end sill
  • W1 -- space between chute blocks
  • W2 -- height of the end sill
  • LB -- Length of the bottom of the basin