WMS:HEC-1 Number of Ordinates (IT): Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
(Redirected page to WMS:HEC-1 Job Control)
 
Line 1: Line 1:
The number of hydrograph ordinates computed during the simulation is defined in this entry. The length of the simulation is determined by the number of ordinates times the computational interval. If a simulation is run and a complete hydrograph is not developed, then the number of ordinates can be increased to increase the length of simulation. Similarly the number of ordinates can be decreased if the simulation continues long past the falling limb of the hydrograph.
#REDIRECT [[WMS:HEC-1 Job Control]]
 
 
==Related Topics==
* [[WMS:HEC-1 Job Control|Job Control Data]]
* [[WMS:HEC-1 Parameters|Edit HEC-1 Parameters]]
* [[WMS:HEC-1 Beginning Time|Beginning Time]]
* [[WMS:HEC-1 Computation Time Interval (IT)|Computation Time Interval (IT)]]
* [[WMS:HEC-1 Day Month Year (IT)|Day Month Year (IT)]]
 
 
{{WMSMain}}

Latest revision as of 17:39, 9 September 2013