Template:MF6 Add Stresses Dialog

From XMS Wiki
Revision as of 20:09, 21 February 2020 by Jcreer (talk | contribs) (Protected "Template:MF6 Add Stresses Dialog" ([Edit=Allow only administrators] (indefinite) [Move=Allow only administrators] (indefinite)))

Jump to navigationJump to search

Add Stresses Dialog

The Add Stresses dialog for the HFB package

The Add Stresses dialog is accessed by clicking Add Rows Row-add.svg in the Periods section of several MODFLOW 6 package dialogs. It contains the following sections and options:

  • Table – Table Options differ according to each package. See chart below.
  • Number of rows to add – Use the Increment Up and Down Increment up and down arrows.png buttons to select the desired number of rows to add.
  • Add to section – Radio buttons with the following options:
    • All defined periods – Select to add the rows to all defined periods.
    • Only this period – Select to add the rows to only this period.
Package Add Stresses Dialog Table Options
CHD
CHD Options
  • LAY – Used to specify certain layers.
  • ROW – Used to specify certain rows.
  • COL – Used to specify certain columns.
  • HEAD – Represents the head at the boundary.
DRN
DRN Options
  • LAY – Used to specify which layer is being applied.
  • ROW – Used to specify which row is being applied.
  • COL – Used to specify which column is being applied.
  • ELEV – Represents the elevation of the drain.
  • COND – Represents the hydraulic conductance between the aquifer and the drain.
GHB
GHB Options
  • LAY – Used to specify certain layers of the module.
  • ROW – Used to specify which row is being applied.
  • COL – Used to specify which column is being applied.
  • BHEAD – Represents the boundary head.
  • COND – Represents the hydraulic conductance between the aquifer cell and the boundary.
HFB
HFB Options
  • LAY1 – Represents the first of two chosen layers.
  • ROW1 – Represents the first of two chosen rows.
  • COL1 – Represents the first of two chosen columns.
  • LAY2 – Represents the second of two chosen layers.
  • ROW2 – Represents the second of two chosen rows.
  • COL2 – Represents the second of two chosen columns.
  • HYDCHR – The hydraulic characteristic of the horizontal-flow barrier. When this variable is negative it multiplied by the conductance of two cells.
LAK
LAK Options
  • LAKENO_OUTLETNO – A value that defines the reach number associated with the specified PERIOD data.
  • SETTING – Information that is linked to keywords and values.
  • VALUE1 – Value to be entered in relation to the specific project.
  • VALUE2 – Value to be entered in relation to the specific project.
MAW
MAW Options
  • WELLNO – A value that defines the reach number associated with the specified PERIOD data.
  • MAWSETTING – Information that is linked to keywords and values.
  • VALUE1 – Value to be entered in relation to the specific project.
  • VALUE2 – Value to be entered in relation to the specific project.
  • VALUE3 – Value to be entered in relation to the specific project.
RIV
RIV Options
  • LAY – Used to specify which row is being applied.
  • ROW – Used to specify which row is being applied.
  • COL – Used to specify which column is being applied.
  • STAGE – Variable that represents the head in the river.
  • COND – Variable that represents the riverbed hydraulic conductance.
  • RBOT – Variable that represents the elevation of the bottom of the riverbed.
SFR
SFR Options
  • RNO – A value that defines the reach number associated with the specified PERIOD data.
  • SFRSETTING – Information that is linked to keywords and values.
  • VALUE1 – Value to be entered in relation to the specific project.
  • VALUE2 – Value to be entered in relation to the specific project.
UZF
UZF Options
  • IUZNO – An integer value that defines the UZF cell number associated with the specified PERIOD data on the line.
  • FINF – A value that defines the applied infiltration rate of the UZF cell.
  • PET – A value that defines the ET rate of the UZF cell and specified GWF cell.
  • EXDP – A value that defines the ET extinction depth of the UZF cell.
  • EXTWC – A value that defines the amount of water removed from the UZF cell through evapotranspiration.
  • HA – A value that defines the amount of potential air that enters the UZF cell.
  • HROOT – A value that defines the root potential of the UZF cell.
  • ROOTACT – A value that defines how much root activity exists in the UZF cell.
WEL
WEL Options
  • LAY – Represents which layer within the grid to which the chosen well will be assigned.
  • ROW – Represents which row within the grid to which the chosen well will be assigned.
  • COL – Represents which column within the grid to which the chosen well will be assigned.
  • Q – Represents the volumetric well rate at which the recharge (positive value) and discharge (negative value) of the well will be.