Template:BOUSS2D Grid Workflow

From XMS Wiki
Jump to navigationJump to search
1. Create grid frame.
With the BOUSS-2D coverage active, do the following:
  1. Use the Create 2D Grid Frame Grid Frame Icon.svg tool to define a the grid frame.
  2. Using the Select 2D Grid Frame Select Grid Frame Tool.svg tool, double-click on the grid frame.
  3. In the Grid Frame Properties dialog, edit the grid frame properties and assign elevation data.
2. Convert coverage to 2D Grid.
  1. Right-click on the BOUSS-2D coverage and select the Convert | Map → 2D Grid command.
  2. In the Grid Frame Properties dialog, review the grid frame properties and assigned elevation data.