Template:TUFLOW Model Properties Workflow
From XMS Wiki
This is the approved revision of this page, as well as being the most recent.
Jump to navigationJump to search
- Bring up the TUFLOW Model Control dialog and define parameters as needed for:
- Time including time steps, start and end times.
- Output including map outputs, dataset outputs, and log outputs.
- Wetting and drying settings.
- Restart files options.
- Initial water levels.
- Eddy viscosity formulation.
- Boundary condition events.
- Constituent properties.
- Material set management.
- Miscellaneous options.
- 1D general controls.
- 1D network controls.
- 1D automatic manholes.