Template:WMS GSSHA Add Tile Drains Workflow

From XMS Wiki
This is the approved revision of this page, as well as being the most recent.
Jump to navigationJump to search
1. Create a tile drain arc.
  1. Create a "GSSHA Storm Drain" coverage.
  2. Create feature arcs placed where the tile drain network will be.
  3. Select all the arcs and WMS:Feature_Objects_Menu#Redistributeredistribute the vertices.
  4. With all the arcs selected, open the attributes and define the arc properties.
  5. Select all feature nodes, open the attributes and set all the properties.
2. Assign pipe and node parameters.
  1. Assign all pipe and node parameters by opening the Properties dialog and clicking the button below Edit Pipes and Nodes.
  2. Select Initialize Pipes from Arc Geometry.