SMS:CMS-Flow Time Control: Difference between revisions
From XMS Wiki
Jump to navigationJump to search
No edit summary |
No edit summary |
||
(15 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
The CMS-Flow Time Control dialog allows the user to specify the starting day and time for the simulation. | __NOINDEX__ | ||
{{SMS Deprecated Feature}} | |||
The ''CMS-Flow Time Control'' dialog allows the user to specify the starting day and time for the simulation. | |||
Other options include: | Other options include: | ||
* Start Time | * ''Start Time'' – The hour at which to begin the model. This will be the first time step listed in any solution files. | ||
* Simulation Duration | * ''Simulation Duration'' – The length of the simulation in hours. | ||
* Ramp Duration | * ''Ramp Duration'' – The period of time in days at which to allow the model to “build up” or “ramp up” to a legitimate solution. Aids in the convergence of the model. | ||
* Time Step Size | * ''Time Step Size'' – The time increment at which M2D makes internal calculations. Running the '''CMS-Flow Model Check''' from the ''CMS-Flow'' menu will provide an initial estimation for the maximum time step size that will produce a convergent result. | ||
==Retlated Topics== | |||
*[[SMS:CMS-Flow Model Control|CMS-Flow Model Control]] | |||
{{Template:Navbox SMS}} | {{Template:Navbox SMS}} | ||
[[Category:CMS-Flow|T]] | |||
[[Category:CMS Dialogs|time]] | |||
[[Category:Archived CMS-Flow|time]] |
Latest revision as of 14:26, 17 June 2019
This contains information about features no longer in use for the current release of SMS. The content may not apply to current versions. |
The CMS-Flow Time Control dialog allows the user to specify the starting day and time for the simulation.
Other options include:
- Start Time – The hour at which to begin the model. This will be the first time step listed in any solution files.
- Simulation Duration – The length of the simulation in hours.
- Ramp Duration – The period of time in days at which to allow the model to “build up” or “ramp up” to a legitimate solution. Aids in the convergence of the model.
- Time Step Size – The time increment at which M2D makes internal calculations. Running the CMS-Flow Model Check from the CMS-Flow menu will provide an initial estimation for the maximum time step size that will produce a convergent result.
Retlated Topics
SMS – Surface-water Modeling System | ||
---|---|---|
Modules: | 1D Grid • Cartesian Grid • Curvilinear Grid • GIS • Map • Mesh • Particle • Quadtree • Raster • Scatter • UGrid | |
General Models: | 3D Structure • FVCOM • Generic • PTM | |
Coastal Models: | ADCIRC • BOUSS-2D • CGWAVE • CMS-Flow • CMS-Wave • GenCade • STWAVE • WAM | |
Riverine/Estuarine Models: | AdH • HEC-RAS • HYDRO AS-2D • RMA2 • RMA4 • SRH-2D • TUFLOW • TUFLOW FV | |
Aquaveo • SMS Tutorials • SMS Workflows |