SMS:SRH-2D Post-Processing Workflow: Difference between revisions
From XMS Wiki
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 5: | Line 5: | ||
|- | |- | ||
|width="800"| | |width="800"| | ||
# Load a completed SRH-2D project. | # Load a completed [[SMS:SRH-2D|SRH-2D]] project. | ||
# Start, build, and run an SRH-2D project. | # Start, build, and run an [[SMS:SRH-2D|SRH-2D]] project. | ||
See also: [[SMS:SRH Project Workflow|SRH Project Workflow]] | See also: [[SMS:SRH Project Workflow|SRH Project Workflow]] | ||
|} | |} |
Revision as of 18:55, 4 August 2015
Post-processing for an SRH-2D model in SMS is done using the following steps:
1. SRH-2D project setup. |
---|
See also: SRH Project Workflow |
2. View SRH output. |
---|
|
3. Compare datasets. |
---|
|
4. Visualize data. |
---|
|
SMS – Surface-water Modeling System | ||
---|---|---|
Modules: | 1D Grid • Cartesian Grid • Curvilinear Grid • GIS • Map • Mesh • Particle • Quadtree • Raster • Scatter • UGrid | |
General Models: | 3D Structure • FVCOM • Generic • PTM | |
Coastal Models: | ADCIRC • BOUSS-2D • CGWAVE • CMS-Flow • CMS-Wave • GenCade • STWAVE • WAM | |
Riverine/Estuarine Models: | AdH • HEC-RAS • HYDRO AS-2D • RMA2 • RMA4 • SRH-2D • TUFLOW • TUFLOW FV | |
Aquaveo • SMS Tutorials • SMS Workflows |