SMS:SRH-2D Culvert Workflow: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 5: Line 5:
|-
|-
|width="800"|
|width="800"|
:Start with an SRH-2D project that .
:Start with an SRH-2D project that ready to have a structure added.
:# Load an [[SMS:SRH-2D|SRH-2D]] project.
:# Load an [[SMS:SRH-2D|SRH-2D]] project.
:# Start and build structures for an [[SMS:SRH-2D|SRH-2D]] project.
:# Start and build componets for an [[SMS:SRH-2D|SRH-2D]] simulation.
:# Before creating a structure, the SRH-2D project should have already have the following:
:See also: [[SMS:SRH Project Workflow|SRH Project Workflow]]
:See also: [[SMS:SRH Project Workflow|SRH Project Workflow]]
|}
|}

Revision as of 21:22, 12 August 2015

To build an SRH-2D model using a culvert, use the following steps:

[show]2. Create culvert boundary conditions.
  1. Create boundary condition arcs for the culvert.
  2. Specify the HY-8 culvert definition file.
  3. Assign the boundary condition attributes and define the culvert in HY-8.
  4. Modify the materials coverage.
[show]3. Specify the initial conditions of the stream.
[show]4. SRH-2D simulation setup.
  1. Create new simulation.
  2. Add components to simulation.
  3. Set up Model Control parameters.
  4. Check the model.
  5. Simulation execution.
  6. Troubleshooting.
[show]5. Review results.
  1. Open _XMDF file.
  2. Results layers.
  3. Observation lines.
  4. Summary table.
  5. Run the Plot Wizard.
  6. Data calculator.