Template:SRH-2D Project Setup Workflow: Difference between revisions
From XMS Wiki
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
:Start with an SRH-2D project that ready to have a structure added. | :Start with an SRH-2D project that is ready to have a structure added. | ||
:# Load an [[SMS:SRH-2D|SRH-2D]] project. | :# Load an [[SMS:SRH-2D|SRH-2D]] project. | ||
:# Start and build componets for an [[SMS:SRH-2D|SRH-2D]] simulation. | :# Start and build componets for an [[SMS:SRH-2D|SRH-2D]] simulation. |
Revision as of 21:44, 12 August 2015
- Start with an SRH-2D project that is ready to have a structure added.
- Load an SRH-2D project.
- Start and build componets for an SRH-2D simulation.
- Before creating a structure, the SRH-2D project should have already have the following:
- Data for project has been imported.
- Elevation data has been reviewed and edited including that all projections are correct.
- Model limits defined using the Mesh Generator coverage and a mesh has been generated from it.
- Materials have been defined in a Materials coverage.
- See also: SRH Project Workflow