Template:SRH-2D Project Setup Workflow: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 1: Line 1:
:Start with an SRH-2D project that ready to have a structure added.
:Start with an SRH-2D project that is ready to have a structure added.
:# Load an [[SMS:SRH-2D|SRH-2D]] project.
:# Load an [[SMS:SRH-2D|SRH-2D]] project.
:# Start and build componets for an [[SMS:SRH-2D|SRH-2D]] simulation.
:# Start and build componets for an [[SMS:SRH-2D|SRH-2D]] simulation.

Revision as of 21:44, 12 August 2015

Start with an SRH-2D project that is ready to have a structure added.
  1. Load an SRH-2D project.
  2. Start and build componets for an SRH-2D simulation.
  3. Before creating a structure, the SRH-2D project should have already have the following:
    1. Data for project has been imported.
    2. Elevation data has been reviewed and edited including that all projections are correct.
    3. Model limits defined using the Mesh Generator coverage and a mesh has been generated from it.
    4. Materials have been defined in a Materials coverage.
See also: SRH Project Workflow