SMS:SRH-2D Pressure Flow Bridge Workflow: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 1: Line 1:
To build an [[SMS:SRH-2D|SRH-2D]] model using a culvert, use the following steps:
To build an [[SMS:SRH-2D|SRH-2D]] model using a pressure flow bridge, use the following steps:
{| class="wikitable collapsible collapsed"
{| class="wikitable collapsible collapsed"
|-
|-

Revision as of 19:28, 13 August 2015

To build an SRH-2D model using a pressure flow bridge, use the following steps:

[show]2. Create pressure flow boundary conditions.
The pressure flow boundary conditions must be defined before running the simulation. To do this:
  1. Create a boundary conditions coverage.
  2. Create boundary condition arcs for the pressure flow.
  3. Assign the boundary condition attributes to the pressure flow arcs.
  4. Modify the materials coverage.
[show]3. Specify the simulation parameters.
The the simulation parameters must be defined before running SRH-2D. To do this:
  1. Create new simulation.
  2. Add components to simulation.
  3. Set up the simulation Model Control parameters.
[show]4. Run the SRH-2D simulation.
  1. Save the project.
  2. Check the model.
  3. Simulation execution.
  4. Troubleshooting.
[show]5. Review results.

Results for the pressure flow can be visualized by doing the following:

  1. Create observation arcs.
  2. Run the Plot Wizard.