User:Jcreer/HY8Main: Difference between revisions
No edit summary |
No edit summary |
||
(29 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
==New== | |||
{{Navbox | {{Navbox | ||
|name = HY8Main | |name = HY8Main | ||
|title = [[HY8:HY-8|HY-8]] | |title = [[HY8:HY-8|HY-8]] | ||
|state = uncollapsed | |state = uncollapsed | ||
|image = | |image = [[File:HY8icon.png|80 px]] | ||
|titlestyle = background: # | |titlestyle = background: #bad6e4; | ||
|groupstyle = background: #d8e2ea; | |groupstyle = background: #d8e2ea; | ||
|belowstyle = background: #d8e2ea; | |belowstyle = background: #d8e2ea; | ||
Line 11: | Line 12: | ||
|list1 = [[HY8:Getting Started|Getting Started]] {{·}} [[HY8:Vena Contracta|Vena Contracta]] {{·}} [[HY8:Building a Project|Building a Project]] {{·}} [[HY8:Locate Project|Locate Project]] {{·}} [[HY8:Culvert Crossing Data|Culvert Crossing Data]] {{·}} [[HY8:Run Analysis|Run Analysis]] {{·}} [[HY8:Report Generation|Report Generation]] | |list1 = [[HY8:Getting Started|Getting Started]] {{·}} [[HY8:Vena Contracta|Vena Contracta]] {{·}} [[HY8:Building a Project|Building a Project]] {{·}} [[HY8:Locate Project|Locate Project]] {{·}} [[HY8:Culvert Crossing Data|Culvert Crossing Data]] {{·}} [[HY8:Run Analysis|Run Analysis]] {{·}} [[HY8:Report Generation|Report Generation]] | ||
|group2 = '''Crossing Data:''' | |group2 = '''Crossing and Culvert Data:''' | ||
|list2 = [[HY8:Crossings|Crossings]] {{·}} [[HY8:Discharge Data|Discharge Data]] {{·}} [[HY8:Roadway Data|Roadway Data]] | |list2 = [[HY8:Crossings|Crossings]] {{·}} [[HY8:Discharge Data|Discharge Data]] {{·}} [[HY8:Roadway Data|Roadway Data]] {{·}} [[HY8:Tailwater Data|Tailwater Data]] {{·}} [[HY8:Irregular Channel|Irregular Channel]] {{·}} [[HY8:Culvert Data|Culvert Data]] {{·}} [[HY8:Site Data Input Option|Site Data]] {{·}} [[HY8:Culvert Invert Data|Culvert Invert Data]] {{·}} [[HY8:Embankment Toe Data|Embankment Toe Data]] | ||
|group3 = | |group3 = '''Analysis''' | ||
|list3 = [[HY8: | |list3 = [[HY8:Project Units|Project Units]] {{·}} [[HY8:Roadway Overtopping|Roadway Overtopping]] {{·}} [[HY8:Inlet Control Computations|Inlet Control Computations]] {{·}} [[HY8:Outlet Control Computations|Outlet Control Computations]] {{·}} [[HY8:Tables and Plots|Tables and Plots]] | ||
|group4 = ''' | |group4 = [[HY8:Energy Dissipators|'''Energy Dissipation''']] | ||
|list4 = [[HY8: | |list4 = [[HY8:Scour Hole Geometry|Scour Hole Geometry]] {{·}} [[HY8:Increased Resistance in Culverts|Increased Resistance]] {{·}} [[HY8:Tumbling Flow|Tumbling Flow]] {{·}} [[HY8:USBR Type IX Baffled Apron|USBR Type IX Baffled Apron]] {{·}} [[HY8:Drop Structures|Drop Structures]] {{·}} [[HY8:Stilling Basins|Stilling Basins]] {{·}} [[HY8:Streambed Level Structures|Streambed Level Structures]] | ||
|group5 = | |group5 = '''Methods''' | ||
|list5 = [[HY8: | |list5 = [[HY8:AOP|Aquatic Organism Passage]] {{·}} [[HY8:LOWFLOW_Method|Low Flow Hydraulics]] | ||
|group6 = [[HY8: | |group6 = '''[[HY8:Troubleshooting|Troubleshooting]]''' | ||
|list6 = [[HY8: | |list6 = [[HY8:Differences from DOS HY-8|Differences from DOS HY-8]] {{·}} [[HY8:Limitations|Limitations]] {{·}} [[HY8:HY-8 User Manual|HY-8 User Manual]] | ||
}}<noinclude>[[Category:HY-8 General Information]]</noinclude> | |||
==Old== | |||
{{HY8Main_Old}} | |||
[[Category:Jcreer|HY8]] | |||
| | |||
Latest revision as of 14:40, 21 July 2017
New
Old
Introduction: Getting Started ·
Differences from DOS HY-8 ·
Limitations ·
Vena Contracta
Building a Project:
Locate Project ·
Culvert Crossing Data ·
Run Analysis ·
Report Generation
— Crossing Data —
General Data:
Crossings ·
Discharge Data
Roadway Data:
Roadway Profile
Tailwater Data:
Channel Shape ·
Rating Curve ·
Constant Tailwater Elevation
Irregular Channel:
Irregular Channel Error
— Culvert Data —
Culvert Data:
Shapes ·
Material ·
Plastic Pipe Materials ·
Concrete Open Bottom Arch ·
South Dakota Concrete Box ·
Culvert Type ·
Broken Back Culverts ·
Inlet Configurations ·
Inlet Depression ·
Embedment Depth
Site Data:
Culvert Invert Data ·
Embankment Toe Data
— Analysis —
General:
Project Units ·
Roadway Overtopping
Headwater Computations:
Inlet Control Computations:
Polynomial Generation ·
Polynomial Coefficients ·
Outlet Control Computations:
Exit Loss Options ·
Hydraulic Jump Calculations
Tables and Plots:
Crossing Summary ·
Culvert Summary ·
Water Surface Profiles ·
Tapered Inlet ·
Customized ·
Controlling Plot Display Options
— Energy Dissipation —
Scour Hole Geometry
Internal Energy Dissipators:
Increased Resistance ·
Tumbling Flow ·
USBR Type IX Baffled Apron
External Dissipators:
Drop Structures:
Box Inlet Drop Structure ·
Straight Drop Structure ·
Stilling Basins:
USBR Type III Stilling Basin ·
USBR Type IV Stilling Basin ·
SAF Stilling Basin ·
Streambed Level Structures:
CSU Rigid Boundary Basin ·
Riprap Basin and Apron ·
Contra Costa Basin ·
Hook Basin ·
USBR Type VI Impact Basin
—
Aquatic Organism Passage
—
Stream Simulation: Stream Simulation ·
Input Reach Data ·
Gradation Data ·
Align and Size ·
Results Table ·
—
Low Flow Hydraulics
—
Low Flow Hydraulics Method ·
Input Data ·
Gradation Data ·
Align and Size ·
Results Table ·
—
Troubleshooting—