GMS:HydroGeoSphere Renumber UGrid: Difference between revisions
From XMS Wiki
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
__NOINDEX__ | __NOINDEX__ | ||
{{Template:Future feature}} | |||
{{Renumber UGrid}} | {{Renumber UGrid}} | ||
Revision as of 22:19, 5 April 2023
This contains information about future features. |
Renumber UGrid for HydroGeoSphere
The Renumber UGrid tool renumbers a 3D UGrid to meet HydroGeoSphere requirements.
The 3D UGrid consists of a set of vertically offset node sheets, each of which is identical in 2D. Between consecutive node sheets is a layer of elements.
- The ordering of elements within each layer is identical, as is the ordering of nodes within each node sheet.
- Nodes are ordered from the bottom sheet (bottom of the domain) to the top sheet (top of the domain).
- Similarly, elements are ordered from the bottom layer (bottom of domain) to the top layer (top of domain).
- Any ordering of elements and nodes within a 2D layer or sheet is fine, so long as it is consistent among all layers and sheets.
- Local node numbering per cell must follow the convention illustrated in Figure 2.
Input Parameters
- Input UGrid – The UGrid to be renumbered.
Output Parameters
- Output UGrid – The name of the UGrid that will be created.
Current Location in Toolbox
HydroGeoSphere | Renumber UGrid
GMS – Groundwater Modeling System | ||
---|---|---|
Modules: | 2D Grid • 2D Mesh • 2D Scatter Point • 3D Grid • 3D Mesh • 3D Scatter Point • Boreholes • GIS • Map • Solid • TINs • UGrids | |
Models: | FEFLOW • FEMWATER • HydroGeoSphere • MODAEM • MODFLOW • MODPATH • mod-PATH3DU • MT3DMS • MT3D-USGS • PEST • PHT3D • RT3D • SEAM3D • SEAWAT • SEEP2D • T-PROGS • ZONEBUDGET | |
Aquaveo |