SMS:CMS-Flow Time Control: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 9: Line 9:
* Ramp Duration – The period of time in days at which to allow the model to  “build up” or “ramp up” to a legitimate solution.  Aids in the convergence of  the model.   
* Ramp Duration – The period of time in days at which to allow the model to  “build up” or “ramp up” to a legitimate solution.  Aids in the convergence of  the model.   


* Time Step Size – The time increment at which M2D makes internal calculations.  Running the CMS-Flow Model Check from the CMS-Flow menu will provide an initial  estimation for the maximum time step size that will produce a convergent result.
* Time Step Size – The time increment at which M2D makes internal calculations.  Running the '''CMS-Flow Model Check''' from the ''CMS-Flow'' menu will provide an initial  estimation for the maximum time step size that will produce a convergent result.





Revision as of 17:04, 6 May 2013

The CMS-Flow Time Control dialog allows the user to specify the starting day and time for the simulation.

Other options include:

  • Start Time – The hour at which to begin the model. This will be the first time step listed in any solution files.
  • Simulation Duration – The length of the simulation in hours.
  • Ramp Duration – The period of time in days at which to allow the model to “build up” or “ramp up” to a legitimate solution. Aids in the convergence of the model.
  • Time Step Size – The time increment at which M2D makes internal calculations. Running the CMS-Flow Model Check from the CMS-Flow menu will provide an initial estimation for the maximum time step size that will produce a convergent result.


Return to CMS-Flow Model Control