SMS:SRH-2D Culvert Workflow: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 9: Line 9:
:# Start and build componets for an [[SMS:SRH-2D|SRH-2D]] simulation.
:# Start and build componets for an [[SMS:SRH-2D|SRH-2D]] simulation.
:# Before creating a structure, the SRH-2D project should have already have the following:
:# Before creating a structure, the SRH-2D project should have already have the following:
:## Data for project has been imported.
:## Elevation data has been reviewed and edited.
:## Model limits defined.
:## Materials have been defined.
:See also: [[SMS:SRH Project Workflow|SRH Project Workflow]]
:See also: [[SMS:SRH Project Workflow|SRH Project Workflow]]
|}
|}

Revision as of 21:24, 12 August 2015

To build an SRH-2D model using a culvert, use the following steps:

2. Create culvert boundary conditions.
  1. Create boundary condition arcs for the culvert.
  2. Specify the HY-8 culvert definition file.
  3. Assign the boundary condition attributes and define the culvert in HY-8.
  4. Modify the materials coverage.
3. Specify the initial conditions of the stream.
4. SRH-2D simulation setup.
  1. Create new simulation.
  2. Add components to simulation.
  3. Set up Model Control parameters.
  4. Check the model.
  5. Simulation execution.
  6. Troubleshooting.
5. Review results.
  1. Open _XMDF file.
  2. Results layers.
  3. Observation lines.
  4. Summary table.
  5. Run the Plot Wizard.
  6. Data calculator.