GMS:Map to MODFLOW with TINs

From XMS Wiki
Revision as of 15:34, 26 April 2013 by Unjedai (talk | contribs)
Jump to navigationJump to search

At times, instead of assigning values at the upstream and downstream ends of the arc, it is useful to assign a property using a surface. This can be done in GMS using a TIN.

TIN assigned to river stage.

When the arc is discretized onto the model grid, the boundary condition property will be interpolated from the TIN.

TIN assigned to river stage.

Beginning with version 9.1, the user can also assign TINs with transient data sets. This will give users the option to have a surface that changes with time assigned to a boundary condition property. The times associated with the TIN data set can be in date/time format or relative time format.

TinModflow3.png
TinModflow4.png
TinModflow5.png

Transient TIN assigned to river stage.

There is a user preference for treating the transient data on the TIN as a step function or as a continuous curve. This option is selected when performing the Map->MODFLOW operation under the Transient TIN data sets section.

User preference for transient TIN data sets.