SMS:SRH-2D Pressure Flow Bridge Workflow

From XMS Wiki
Revision as of 16:35, 13 August 2015 by Jcreer (talk | contribs)
Jump to navigationJump to search

To build an SRH-2D model using a culvert, use the following steps:

2. Create culvert boundary conditions.
The culvert boundary conditions must be defined before running the simulation. To do this:
  1. Create a boundary conditions coverage.
  2. Create boundary condition arcs for the culvert.
  3. Specify the HY-8 culvert definition file.
  4. Assign the boundary condition attributes and define the culvert in HY-8.
  5. Modify the materials coverage.
3. Specify the simulation parameters.
The initial conditions of the stream must be defined in the simulation. To do this:
  1. Create new simulation.
  2. Add components to simulation.
  3. Set up the simulation Model Control parameters.
  4. Specify the restart conditions file under initial conditions.
4. Run the SRH-2D simulation.
  1. Save the project.
  2. Check the model.
  3. Simulation execution.
  4. Troubleshooting.
5. Review results.
  1. Open _XMDF file.
  2. Results layers.
  3. Observation lines.
  4. Summary table.
  5. Run the Plot Wizard.
  6. Data calculator.