SMS:SRH-2D Pressure Flow Bridge Workflow

From XMS Wiki
Revision as of 16:50, 13 August 2015 by Jcreer (talk | contribs)
Jump to navigationJump to search

To build an SRH-2D model using a culvert, use the following steps:

2. Create pressure flow boundary conditions.
The pressure flow boundary conditions must be defined before running the simulation. To do this:
  1. Create a boundary conditions coverage.
  2. Create boundary condition arcs for the pressure flow.
  3. Assign the boundary condition attributes to the pressure flow arcs.
  4. Modify the materials coverage.
3. Specify the simulation parameters.
The the simulation parameters must be defined before running SRH-2D. To do this:
  1. Create new simulation.
  2. Add components to simulation.
  3. Set up the simulation Model Control parameters.
4. Run the SRH-2D simulation.
  1. Save the project.
  2. Check the model.
  3. Simulation execution.
  4. Troubleshooting.
5. Review results.

Results for the pressure flow can be visualized by doing the following:

  1. Create observation arcs.
  2. Run the Plot Wizard.