WMS:GSSHA Initial Overland Flow Model Workflow: Revision history

From XMS Wiki
Jump to navigationJump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

3 May 2023

  • curprev 18:2018:20, 3 May 2023Mburton talk contribs 2,302 bytes +2,302 Created page with "To set up a GSSHA initial overland flow model in WMS, use the following steps: {|class="mw-collapsible mw-collapsed" style="width:100%; border:1px solid #BFC9C5; margin-bottom:0.4em;" |- !style="text-align:left;"|1. Delineate a watershed. |- | :#Build a single watershed basin. GSSHA models require having a single watershed boundary polygon. |} {|class="mw-collapsible mw-collapsed" style="width:100%; border:1px solid #BFC9C5; mar..."