From XMS Wiki
This is the approved revision of this page, as well as being the most recent.
Jump to navigationJump to search
1. Change display options.
|
2. View display.
|
- Use the Rotate , Pan , and Zoom tools.
- Use the View menu commands found in the Display menu.
- Use the Frame command to center and resize the display as needed.
|
3. Adjust display.
|
- Display may need to be adjusted during the remainder of the project.
- Use the Display Options dialog and viewing tools as needed.
- Use the Frame command to center and resize the display as needed.
|
|
2. Change contour options.
|
- Turn on Contours in the Display Options dialog and set contour options. The "Color Fill" option is recommended for this.
- Look for inconsistent points (points with values much higher/lower than their neighbors or regions where no data points exist).
- Verify that the region being modeled is covered by the elevation/depth data and there are no holes.
|
3. Create a plot.
|
- If a PEST Observations package was included with the model, do the following to visualize the results:
- Under the " Map Data", find the coverages labelled with PEST.
- Click on them to visualize whisker plots in the Graphics Window.
- Right-click on a coverage and use the Observations command to view plots related to the data in the coverages in the Observations dialog.
|
4. Create an animation.
|
- Select a solution dataset and use the Display | Animate menu command.
- Use the Animation Wizard to specify the animation parameters.
- Save and view the animation file.
|
5. Visualize water budgets.
|
1. Visualize the VOLUME BUDGET section of the text solution file.
|
- Double-click on a text file under the MODFLOW 6 solution folder in the Project Explorer. It might end in ".lst" or ".out".
- Scroll to the bottom of the file to the VOLUME BUDGET section, and review the values.
|
2. Run ZONEBUDGET and visualize the results.
|
1. Create the Zones package.
|
- Use the New Package | Zones command to open the Zone File dialog.
- Using the Zone File dialog, define the zones.
- Right-click on the MODFLOW 6 simulation and select Save Simulation to export the zone package file.
|
2. Run ZONEBUDGET.
|
- Under the MODFLOW solution folder in the Project Explorer, right-click on the file ending in ".cbc" and select Run ZONEBUDGET.
|
3. Visualize the results of ZONEBUDGET.
|
- Under the folder ending in "zone_budget", double-click on either file to open it in an outside program.
- The file ending in ".lst" has the results of ZONEBUDGET at the bottom under a section that begins VOLUME BUDGET.
- The file ending in ".csv" can be opened in a spreadsheet application or text editor.
|
|
|