SMS:Import Data Workflow: Difference between revisions
From XMS Wiki
Jump to navigationJump to search
(Created page with "To import data in to SMS, use the following steps: {| class="wikitable collapsible collapsed" |- !width="800" style="text-align:left;"|1. SMS project setup. |- |width="800"| {...") |
No edit summary |
||
Line 28: | Line 28: | ||
|- | |- | ||
| | | | ||
:# Check data | :# Check data check data to see that it shows up in the Project Explorer and any feature objects are in the Graphics Window. | ||
:# Check data projection. | |||
:# Check data attributes. | |||
|} | |} |
Revision as of 17:10, 14 July 2015
To import data in to SMS, use the following steps:
1. SMS project setup. | ||||
---|---|---|---|---|
|
2. Gather data files. |
---|
|
3. Open files. |
---|
|
4. Review data. |
---|
|
SMS – Surface-water Modeling System | ||
---|---|---|
Modules: | 1D Grid • Cartesian Grid • Curvilinear Grid • GIS • Map • Mesh • Particle • Quadtree • Raster • Scatter • UGrid | |
General Models: | 3D Structure • FVCOM • Generic • PTM | |
Coastal Models: | ADCIRC • BOUSS-2D • CGWAVE • CMS-Flow • CMS-Wave • GenCade • STWAVE • WAM | |
Riverine/Estuarine Models: | AdH • HEC-RAS • HYDRO AS-2D • RMA2 • RMA4 • SRH-2D • TUFLOW • TUFLOW FV | |
Aquaveo • SMS Tutorials • SMS Workflows |