SMS:SRH-2D Culvert Workflow: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 5: Line 5:
|-
|-
|width="800"|
|width="800"|
{{SRH-2D Project Setup}}
:Start with an SRH-2D project that ready to have a structure added.
:Start with an SRH-2D project that ready to have a structure added.
:# Load an [[SMS:SRH-2D|SRH-2D]] project.
:# Load an [[SMS:SRH-2D|SRH-2D]] project.

Revision as of 21:32, 12 August 2015

To build an SRH-2D model using a culvert, use the following steps:

2. Create culvert boundary conditions.
  1. Create boundary condition arcs for the culvert.
  2. Specify the HY-8 culvert definition file.
  3. Assign the boundary condition attributes and define the culvert in HY-8.
  4. Modify the materials coverage.
3. Specify the initial conditions of the stream.
4. SRH-2D simulation setup.
  1. Create new simulation.
  2. Add components to simulation.
  3. Set up Model Control parameters.
  4. Check the model.
  5. Simulation execution.
  6. Troubleshooting.
5. Review results.
  1. Open _XMDF file.
  2. Results layers.
  3. Observation lines.
  4. Summary table.
  5. Run the Plot Wizard.
  6. Data calculator.