Automated Parameter Estimation Workflow
From XMS Wiki
This is the approved revision of this page, as well as being the most recent.
Jump to navigationJump to search
To calibrate an existing MODFLOW model, use the following steps:
1. Start with a completed MODFLOW Project. |
---|
|
2. Define parameter zones. |
---|
|
3. Turn on PEST. |
---|
|
4. Editing PEST parameters. |
---|
|
5. Saving the project and running PEST. |
---|
|
6. Visualize the solution. | ||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
GMS – Groundwater Modeling System | ||
---|---|---|
Modules: | 2D Grid • 2D Mesh • 2D Scatter Point • 3D Grid • 3D Mesh • 3D Scatter Point • Boreholes • GIS • Map • Solid • TINs • UGrids | |
Models: | FEFLOW • FEMWATER • HydroGeoSphere • MODAEM • MODFLOW • MODPATH • mod-PATH3DU • MT3DMS • MT3D-USGS • PEST • PHT3D • RT3D • SEAM3D • SEAWAT • SEEP2D • T-PROGS • ZONEBUDGET | |
Aquaveo |