GMS:Horizons to UGrid: Difference between revisions
From XMS Wiki
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 8: | Line 8: | ||
#'''Assign Horizon IDs''' – The term “horizon” refers to the top of each stratigraphic unit that will be represented in a corresponding solid, HUF unit or material layer. Horizons are numbered consecutively in the order that the strata are “deposited” (from the bottom up). Horizons can be assigned to both boreholes and TINs. (See [[GMS:Horizons|Horizons]]) | #'''Assign Horizon IDs''' – The term “horizon” refers to the top of each stratigraphic unit that will be represented in a corresponding solid, HUF unit or material layer. Horizons are numbered consecutively in the order that the strata are “deposited” (from the bottom up). Horizons can be assigned to both boreholes and TINs. (See [[GMS:Horizons|Horizons]]) | ||
#'''Create Primary UGrid (2D)''' – A 2D UGrid is needed to be used as a projection for the resulting 3D UGrid. A 2D UGrid needs to be created and selected as the primary UGrid. The 2D UGrid defines the boundary of the 3D UGrid. | #'''Create Primary UGrid (2D)''' – A 2D UGrid is needed to be used as a projection for the resulting 3D UGrid. A 2D UGrid needs to be created and selected as the primary UGrid. The 2D UGrid defines the boundary of the 3D UGrid. | ||
#'''Setup additional optional inputs''' – Two additional options exist to help constrain and provide user intervention in the | #'''Setup additional optional inputs''' – Two additional options exist to help constrain and provide user intervention in the horizon modeling process. The two options are to create borehole cross sections or a horizon conceptual model. | ||
##[[GMS:Including Borehole Cross Sections|Including Borehole Cross Sections]] | ##[[GMS:Including Borehole Cross Sections|Including Borehole Cross Sections]] | ||
##[[GMS:Horizon Conceptual Model|Horizon Conceptual Model]] | ##[[GMS:Horizon Conceptual Model|Horizon Conceptual Model]] |