#'''Create/Import Inputs''' – There are two main types of inputs for the horizons method: | #'''Create/Import Inputs''' – There are two main types of inputs for the horizons method: | ||
##Boreholes – Boreholes can be created by importing borehole data by using the [[GMS:File Import Wizard|File Import Wizard]], importing sample data after boreholes already exist, or using the borehole tools to manually enter the boreholes. Once a borehole has been created it can be edited in the Borehole Editor or by using the borehole tools. Also an existing borehole can be copied. Boreholes can be locked to prevent them from being edited. | ##Boreholes – Boreholes can be created by importing borehole data by using the [[GMS:File Import Wizard|''File Import Wizard'']], importing sample data after boreholes already exist, or using the borehole tools to manually enter the boreholes. Once a borehole has been created it can be edited in the ''Borehole Editor'' or by using the borehole tools. Also an existing borehole can be copied. Boreholes can be locked to prevent them from being edited. | ||
##TINs – TINs can be created 3 different ways in GMS: manually entering the vertex locations and triangulating, converting a different GMS data type to a TIN, and copying a currently existing TIN. (See [[GMS:TIN Module#Creating a TIN|Creating TINs]]) | ##TINs – TINs can be created 3 different ways in GMS: manually entering the vertex locations and triangulating, converting a different GMS data type to a TIN, and copying a currently existing TIN. (See [[GMS:TIN Module#Creating a TIN|Creating TINs]]) | ||
##[[GMS:Raster Catalog|Raster Catalog]] – | ##[[GMS:Raster Catalog|Raster Catalog]] – A set of rasters defining the top of each horizon (available beginning in version 9.0). | ||
#'''Assign Horizon IDs''' – The term “horizon” refers to the top of each stratigraphic unit that will be represented in a corresponding | #'''Assign Horizon IDs''' – The term “horizon” refers to the top of each stratigraphic unit that will be represented in a corresponding solid, HUF unit or material layer. Horizons are numbered consecutively in the order that the strata are “deposited” (from the bottom up). Horizons can be assigned to both boreholes and TINs. (See [[GMS:Horizons|Horizons]]) | ||
#'''Create Primary UGrid (2D)''' – A 2D UGrid is needed to be used as a projection for the resulting 3D UGrid. A 2D UGrid needs to be created and selected as the primary UGrid. The 2D UGrid defines the boundary of the 3D UGrid. | #'''Create Primary UGrid (2D)''' – A 2D UGrid is needed to be used as a projection for the resulting 3D UGrid. A 2D UGrid needs to be created and selected as the primary UGrid. The 2D UGrid defines the boundary of the 3D UGrid. | ||
#'''Setup additional optional inputs''' – Two additional options exist to help constrain and provide user intervention in the | #'''Setup additional optional inputs''' – Two additional options exist to help constrain and provide user intervention in the horizon modeling process. The two options are to create borehole cross sections or a horizon conceptual model. | ||
##[[GMS:Including Borehole Cross Sections|Including Borehole Cross Sections]] | ##[[GMS:Including Borehole Cross Sections|Including Borehole Cross Sections]] | ||
##[[GMS:Horizon Conceptual Model|Horizon Conceptual Model]] | ##[[GMS:Horizon Conceptual Model|Horizon Conceptual Model]] | ||
#'''Run the Horizons Wizard''' – Select the '''''Horizons→UGrid''''' command in the ''Borehole'' or ''TINs'' menu. | #'''Run the Horizons Wizard''' – Select the '''''Horizons→UGrid''''' command in the ''Borehole'' or ''TINs'' menu. | ||
== Horizon → UGrid Algorithm == | == Horizon → UGrid Algorithm == | ||
When the Horizon command is executed the horizons specified on the borehole contacts or TIN nodes are converted to a set of scatter points with one dataset for each horizon. The scatter points are then used to interpolate a surface for each horizon. Starting with the lowest numbered horizon, the surface is extruded down to create a set of cells in a UGrid. The surface corresponding to the next horizon is then extruded down to fill in the space between that surface and the previous surface. This process is repeated for each surface. At each step, a set of cells are created for the current horizon and all previously defined cells are subtracted from that layer, resulting in an incremental buildup of the stratigraphy from the bottom to the top. The entire process results in a UGrid with each horizon layer represented by a | When the '''Horizon→UGrid''' command is executed the horizons specified on the borehole contacts or TIN nodes are converted to a set of scatter points with one dataset for each horizon. The scatter points are then used to interpolate a surface for each horizon. Starting with the lowest numbered horizon, the surface is extruded down to create a set of cells in a UGrid. The surface corresponding to the next horizon is then extruded down to fill in the space between that surface and the previous surface. This process is repeated for each surface. At each step, a set of cells are created for the current horizon and all previously defined cells are subtracted from that layer, resulting in an incremental buildup of the stratigraphy from the bottom to the top. The entire process results in a UGrid with each horizon layer represented by a material zone. | ||
[[Image:Hor_UGrid.png|none|frame|UGrid created via the horizons method]] | :[[Image:Hor_UGrid.png|none|frame|UGrid created via the horizons method]] | ||