GMS:Horizons: Difference between revisions
From XMS Wiki
Jump to navigationJump to search
Line 5: | Line 5: | ||
== Assigning Horizons to Boreholes== | == Assigning Horizons to Boreholes== | ||
On boreholes, Horizons are defined at borehole contacts. Each contact that the user wishes to include in the construction of the solid must have a non-zero horizon ID. If the user wishes to ignore a contact, this can be done by leaving the horizon ID set to zero. Horizons are numbered in the order that the strata are “deposited” (from the bottom up). Gaps can exist in the horizon numbering. For example, horizons can be assigned using 1, 2, 3, | On boreholes, Horizons are defined at borehole contacts. Each contact that the user wishes to include in the construction of the solid must have a non-zero horizon ID. If the user wishes to ignore a contact, this can be done by leaving the horizon ID set to zero. Horizons are numbered in the order that the strata are “deposited” (from the bottom up). Gaps can exist in the horizon numbering. For example, horizons can be assigned using 1, 2, 3, etc..., or the user could assign horizons using 10, 20, 30, etc... Using larger numbers with gaps can be useful if more horizons are added at a later time. | ||
=== Automatic Assignment === | === Automatic Assignment === |