WMS:TR-55 Outlet Data: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 13: Line 13:
{{WMSMain}}
{{WMSMain}}
[[Category:TR-55|O]]
[[Category:TR-55|O]]
[[Category:TR-55 Dialogs]]
[[Category:TR-55 Dialogs|O]]


{{stub}}
{{stub}}

Revision as of 16:18, 6 March 2017

WMS allows defining the watershed as a single basin or subdivide the watershed into multiple sub-basins. Besides computing peak flows using the standard TR-55 equations, storm hydrographs may also be computed for each basin and then combined/lagged to downstream outlets (junctions) using the TR-55 tabular hydrograph method.

When creating a watershed with multiple sub-basins, define the time of travel from one outlet (junction) to the next. The travel time for an outlet is defined by selecting the outlet and then entering the appropriate travel time. If desired, use a time computation arc to compute the travel time.


Related Topics