WMS:HEC-1 Beginning Time: Difference between revisions
From XMS Wiki
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
==Related Topics== | ==Related Topics== | ||
* [[WMS:HEC-1 Job Control | * [[WMS:HEC-1 Job Control|Job Control Data]] | ||
* [[WMS:HEC-1 Parameters|Edit HEC-1 Parameters]] | * [[WMS:HEC-1 Parameters|Edit HEC-1 Parameters]] | ||
* [[WMS:HEC-1 Computation Time Interval (IT)|Computation Time Interval (IT)]] | * [[WMS:HEC-1 Computation Time Interval (IT)|Computation Time Interval (IT)]] |
Revision as of 18:15, 5 February 2013
The beginning time of the simulation is defined in this entry. The time should be specified as a single integer number defining the hours and minutes. For example 7:45 am would be entered as 745 and 1:15 PM would be 1315. Do not place a colon between the hours and minutes.
Related Topics
- Job Control Data
- Edit HEC-1 Parameters
- Computation Time Interval (IT)
- Day Month Year (IT)
- Number of Ordinates (IT)
WMS – Watershed Modeling System | ||
---|---|---|
Modules: | Terrain Data • Drainage • Map • Hydrologic Modeling • River • GIS • 2D Grid • 2D Scatter | |
Models: | CE-QUAL-W2 • GSSHA • HEC-1 • HEC-HMS • HEC-RAS • HSPF • MODRAT • NSS • OC Hydrograph • OC Rational • Rational • River Tools • Storm Drain • SMPDBK • SWMM • TR-20 • TR-55 | |
Toolbars: | Modules • Macros • Units • Digitize • Static Tools • Dynamic Tools • Drawing • Get Data Tools | |
Aquaveo |