WMS:HEC-1 Computation Time Interval (IT): Difference between revisions
From XMS Wiki
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
==Related Topics== | ==Related Topics== | ||
* [[WMS:HEC-1 Job Control | * [[WMS:HEC-1 Job Control|Job Control Data]] | ||
* [[WMS:HEC-1 Parameters|Edit HEC-1 Parameters]] | * [[WMS:HEC-1 Parameters|Edit HEC-1 Parameters]] | ||
* [[WMS:HEC-1 Beginning Time|Beginning Time]] | * [[WMS:HEC-1 Beginning Time|Beginning Time]] |
Revision as of 18:15, 5 February 2013
The computational time interval defines the length in time between hydrograph ordinates. The interval should be specified in minutes, with 1 being the minimum. The total simulation time of the model will be the number of ordinates minus one times the computational time interval.
Related Topics
WMS – Watershed Modeling System | ||
---|---|---|
Modules: | Terrain Data • Drainage • Map • Hydrologic Modeling • River • GIS • 2D Grid • 2D Scatter | |
Models: | CE-QUAL-W2 • GSSHA • HEC-1 • HEC-HMS • HEC-RAS • HSPF • MODRAT • NSS • OC Hydrograph • OC Rational • Rational • River Tools • Storm Drain • SMPDBK • SWMM • TR-20 • TR-55 | |
Toolbars: | Modules • Macros • Units • Digitize • Static Tools • Dynamic Tools • Drawing • Get Data Tools | |
Aquaveo |